Energy Storage
This is one of the first energy storage facilities of its kind in Israel.
The facility has a capacity of 2.2 MW and a storage capacity of 10.2 MWh with a BTM (Behind the Meter) connection configuration.
Mashav has developed a unique EMS system for the facility that optimizes the Nesharim power plant’s operation and the Nesher cement plant electricity consumption through the storage system.